Meghnaghat 335 MW (Summit) Dual Fuel Power Plant (Unit 1)

Updated: Mar 14, 2023

Current Status: Operation

Meghnaghat 335 MW Dual Fuel Power Plant, also known as Summit Meghnaghat CC Power Plant, is a Combined Cycle (CC) power plant situated in Char Ramzan Sanaullah of Meghnaghat Island under Sonargaon Upazila in Narayanganj District of Bangladesh (Location: 23.6087, 90.5963). It is sponsored by Summit Meghnaghat Power Company Limited (SMPCL), a subsidiary of Summit Group, as a private Independent Power Producer (IPP) for 22 years. The first unit of the power plant started commercial operation on 29 May 2014 while the second unit started on 1 June 2015. As per schedule, the first unit will retire on 28 May 2036, and the second unit on 31 May 2037.


Capacity

The installed (gross) capacity of the power plant is 335 MW.