top of page
Search

Banshkhali 200 MW (Eleris) Solar Power Plant

Updated: Feb 16, 2023

Current Status: Proposed

Eleris Energy Global is a subsidiary of Pacific Energy Group, United States. On 20 June 2021, the President of Eleris Energy Global met the Minister of Environment Forest and Climate Change (MOEFCC) and sought his assistance in conducting Environmental Impact Assessment (EIA) for the construction of the power plant (FE 2021). In the meeting, Eleris informed that the power plant was under construction, although there is nothing mentioned about the power plant in Bangladesh Power Development Board (BPDB) the progress report June 2022 (BPDB 2022).

 

References

73 views

Comments


bottom of page