Current Status: Operation

Santahar 50 MW Furnace Oil Power Plant, also known as Santahar Peaking Power Plant, is a reciprocating engine-based power plant situated in Raninagar of Santahar under Adamdighi Upazila in Bogra District of Bangladesh (Location: 24.7973, 88.9840). It is sponsored by Bangladesh Power Development Board (BPDB) as a State-owned Power Plant (SOPP) for 25 years. The power plant started its commercial operation on 7 December 2012 and, as per schedule, it will retire on 6 December 2037.


Capacity

The installed (gross) and derated (net) capacity of the power plant is 52.39 MW and 50 MW respectively.